Chapter 11 项目CTQ控制
(Controling Project CTQ)
Teaching purpose(教学目的)
Control system always guides the project to the right direction. It is indispensable in any project management. In this chapter the students will be taught the basic control theory,such as components of project control system, how control system works, the PDCA controlling loop. Besides, the knowledge about how to deal with specific control work around project CTQ will be taught. (控制系统总是将项目导向正确的方向。它在任何项目管理中都不可或缺。在本章中,学生将学习基本控制理论,比如控制系统的构成,控制系统如何工作,PDCA控制环。此外,还将给学生讲授如何针对项目的成本、时间、质量开展具体的控制工作。)
Learning objectives(学习目标)
In this chapter you will learn to do the following:
Describe the objectives, components of a project control system.
(描述项目控制系统的目标,组成)
Point out the basics of how a project control system works.
(了解项目控制系统工作原理)
Explain the TQM, PDCA theory
(解释全面质量管理以及PDCA循环理论)
Describe the models used to monitor and control cash inflows and outflows.
(描述用于监控现金流入和流出的模型)
Explain what's crashing,and why (解释什么是赶工,为什么会赶工)
Explain how to properly measure cost and schedule performance---EVA)
(解释如何正确衡量成本进度绩效-----挣值分析)
Teaching contents(教学目录)
Project control system
Introdcution; Components of Project control system ; Basic control theory
Quality control(TQM , PDCA) (质量控制)
Cost and time Baselines (成本工期基线)
Cost and time performance Models (成本与工期绩效模型)
EVA (挣值分析)
Teaching assistance(教学辅助)
Chapter11.项目CTQ控制

