实践任务:设计一套火电厂水汽循环系统协同优化方案,覆盖凝结水处理(CP)、给水处理(FW)、炉水处理(BW)三大环节,通过技术创新解决以下矛盾之一Practical task: Design a coordinated optimization scheme for the water and steam circulation system of a thermal power plant, covering three major sections: condensate treatment (CP), feedwater treatment (FW), and boiler water treatment (BW). Through technological innovation, solve one of the following contradictions:
(1)经济性矛盾:降低药剂/能耗 vs. 保障水质Economic contradiction: Reducing the cost of chemicals/energy consumption vs. Ensuring water quality
(2)环保矛盾:减少废水排放 vs. 满足苛刻水质标准Environmental protection dilemma: Reducing wastewater discharge vs. Meeting stringent water quality standards
(3)效率矛盾:缩短启动时间 vs. 稳定热力系统Efficiency contradiction: Shortening startup time vs. Stabilizing thermal system