Fixed and flexible budgets
上一节
下一节
}The flexed budget (budget cost allowance) is calculated as follows:
}Fixed cost : no change
}Variable costs:
Budgeted cost allowance

}Semi-variable cost: The fixed elementwill not change andthe variable element will be flexed as above

